News

December 7, 2009; The Washington Times

Building Hope was able to use its experience in renovating buildings for public charter schools to help the builders and contractors complete the project on time. In particular, Pepco ensured the school’s power was running smoothly by open day. Timely delivery occurred despite the late discovery of extensive mold in the walls that had to be removed. Cooperation and teamwork won the day, said S. Joseph Bruno, president of Building Hope.

Download entire article (pdf)

var gaJsHost = (("https:" == document.location.protocol) ? "https://ssl." : "http://www."); document.write(unescape("%3Cscript src='" + gaJsHost + "google-analytics.com/ga.js' type='text/javascript'%3E%3C/script%3E"));